hit counter script

Cisco 3110G Hardware Installation Manual page 28

Catalyst switch module for ibm bladecenter
Hide thumbs Also See for 3110G:
Table of Contents

Advertisement

Installing Devices in the 10-Gigabit Ethernet Slot
Verify the correct orientation of your module before inserting it into the slot. Incorrect insertion can
Caution
damage the module.
Slide the transceiver module into the opening until the back of the module faceplate is flush with the
Step 5
switch module faceplate.
Figure 2-7
Removing a Module
To remove an X2 transceiver module, follow these steps:
Attach an ESD-preventive wrist strap to your wrist and to a bare metal surface.
Step 1
Disconnect the cables from the module. For fiber-optic modules, install the optical bore dust plugs.
Step 2
Carefully pull on the X2 module sleeve to disengage it from the slot. Grasp the edges of the module, and
Step 3
carefully slide it out of the slot.
Reinstall a replacement module or the module slot cover in the 10-Gigabit Ethernet slot.
Step 4
Place the module in an antistatic bag or other protective environment.
Step 5
Catalyst Switch Module 3110G, 3110X, and 3012 for IBM BladeCenter Hardware Installation Guide
2-12
Installing an X2 Transceiver Module
C
O
N
S
O
L
M
O
E
!
D
E
M
M
B
S
R
T
X 2
1 S TA
C K 2
Chapter 2
Switch Module Installation
OL-12192-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

30123110x

Table of Contents