Model Numbers 900CS10-00 and 900CS15-00
Document Number: 51-52-33-157 Revision 6
Effective: 05/20/11
Supersedes: Revision 5, 11/23/10
Summary
These instructions explain how to install your Control Station. Once installed, the unit must be configured.
Configuration is a detailed process described in other documents.
The overall steps for getting your Control Station up and running are as follows.
Step
1
Install the unit per this instruction sheet.
Refer to other documentation for details on the following steps.
2
After completing installation, configure the HC900 controller for your application using Hybrid
Control Designer software and save the .cde file.
3
Using Station Designer software, create data tags from your .cde file, create your operator
interface configuration and save the .sds file.
4
Download the .sds file to the 900 Control Station and verify operation.
Note: Configuration of the 900 Control Station may be performed prior to mounting if found to be more
convenient when using the USB port since once loaded the configuration is maintained in non-volatile
memory, but doing so requires the station to be connected to a 24Vdc power supply.
Contents of package
Check that you received the following items.
Control Station
Panel Gasket
Template for panel cutout
Hardware packet for mounting unit into panel
Power connector (3 terminals)
Documentation CD
Supplied separately
Flash Memory Module (optional) Note: The Flash Memory Module must be a UL approved component
Smart Modular Technologies model SG9CF (UL Listed Directory Category NWGQ) to maintain UL
station approval when installed.
51-52-33-157 Rev. 6
HC900 Control Station
Installation
Action
Page 1 of 14