hit counter script

To Service Personnel - Yamaha RP-U200 Service Manual

Personal receiver
Hide thumbs Also See for RP-U200:
Table of Contents

Advertisement

RP-U200

TO SERVICE PERSONNEL

1. Critical Components Information
Components having special characteristics are marked Z
and must be replaced with parts having specifications equal
to those originally installed.
2. Leakage Current Measurement (For 120V Models Only)
When service has been completed, it is imperative to verify
that all exposed conductive surfaces are properly insulated
from supply circuits.
Meter impedance should be equivalent to 1500 ohm shunted
by 0.15µF.
Leakage current must not exceed 0.5mA.
WARNING: CHEMICAL CONTENT NOTICE!
The solder used in the production of this product contains LEAD. In addition, other electrical/
electronic and/or plastic (where applicable) components may also contain traces of chemicals
found by the California Health and Welfare Agency (and possibly other entities) to cause
cancer and/or birth defects or other reproductive harm.
DO NOT PLACE SOLDER, ELECTRICAL/ELECTRONIC OR PLASTIC COMPONENTS IN
YOUR MOUTH FOR ANY REASON WHATSOEVER!
Avoid prolonged, unprotected contact between solder and your skin! When soldering, do not
inhale solder fumes or expose eyes to solder/flux vapor!
If you come in contact with solder or components located inside the enclosure of this product,
wash your hands before handling food.
1
EQUIPMENT
WALL
OUTLET
UNDER TEST
INSULATING
TABLE
Be sure to test for leakage with the AC plug in both
polarities.
AC LEAKAGE
TESTER OR
EQUIVALENT

Advertisement

Table of Contents
loading

Table of Contents