▀ Save Shipping Cartons
Installing a Front Baffle Card
Step 1
Flip both ejector handles outward from the front of the card.
Step 2
Align the baffle card within an unused chassis slot.
Step 3
Slide the card into the slot until its front panel is flush with the upper and lower card rails.
Step 4
Push the ejector handles inward until they are flush with the front of the card.
Step 5
Use a Phillips #2 screwdriver to tighten the captive screws within the ejector handles on the top and bottom of the card
to secure it to the chassis.
Step 6
Repeat step 1 through step 5 for any additional unused chassis slots.
Installing a Rear Baffle Card
Step 1
Align the baffle card within an unused chassis slot.
Step 2
Slide the card into the slot until its front panel is flush with the upper and lower card rails.
Step 3
Use a Phillips #2 screwdriver to tighten the captive screws at the top and bottom of the baffle card to secure it to the
chassis.
Step 4
Repeat step 1 through step 3 for any additional unused chassis slots.
Save Shipping Cartons
Save several of the shipping cartons and protective ESD bags in which the circuit cards were packaged. Use the cartons
to package a circuit card for shipment back to Cisco for failure analysis and replacement. For additional information,
refer to the Returning Failed Components in the Replacing Components chapter, and the RMA Shipping Procedures
appendix.
▄ ASR 5500 Installation Guide
68
Card Installation