hit counter script

Cisco CDB-8U Installation Manual page 78

Catalyst digital building series switch
Table of Contents

Advertisement

Switch Installation
Rack Mounting
Procedure
Step 1
Position the 19-inch 5RU rack mount chassis in the rack and align the mounting holes in the chassis with the
mounting holes in the rack. Secure the chassis using eight 10-32 or 12-24 screws to the rack post.
Figure 46: Installation of Rack Mount Chassis on a 19-inch Rack
You can also install the rack mount chassis upside down if required for cable routing.
Catalyst Digital Building Series Switch Hardware Installation Guide
68

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdb-8p

Table of Contents