hit counter script

Methodology - ABB 800xA Operation

Electrical control system, a safety system and a collaboration enabler
Hide thumbs Also See for 800xA:
Table of Contents

Advertisement

Methodology

Calculated Values
The calculated values are:
Methodology
The heat exchanger will operate at one or more OPS for long enough to be
considered steady state operation, such that Base Operating Point Set (BOPS) and
Comparative Operation Point Set (COPS) may be read and saved for comparative
Performance Factor calculations.
Training
During the Training Period (TP), input plant data sets will be read, and an associated
Ebaseline and Ubaseline will be calculated. A BOP will be created for each stable
significantly different operating level of the heat exchanger. Significantly different
will be determined by a percentage (Delta BOPS) that is configured by the user or
greater change in any one or more of the following variables:
146
Mass flow greater than 1,000,000 Kg/hr.
Pressure less than -10,000 (no units).
Pressure greater than 10,000 (no units).
Volume flow less than 0 M
Volume flow greater than 1,000,000 M
E: Performance Factor.
U: Heat Transfer Efficiency.
HD Hot: Hot Side Heat Duty.
HD Cold: Cold Side Heat Duty.
T Hot In.
T Hot Out.
T Cold Out.
T Cold In.
Delta Tx.
W Hot.
Section 9 Heat Exchanger Asset Monitor (HXAM)
3
/hr.
3
/hr.
3BUA000150-600

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents