Chapter 3 Operation of Front Panel Indicators
Initial Power Up, Calibration, and Registration (AC
Power Applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power up, calibration, and
registration process of your residential gateway.
Note: After the residential gateway completes Step 7 (Data Network Registration
Complete), the residential gateway proceeds immediately to Normal Operations. See
Normal Operations (AC Power Applied) (on page 20).
Front Panel LED Status Indicators During Initial Pow er Up, Calibration, and
Registration
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
LINK
6
USB
7
WIRELESS
ON/OFF
8
WIRELESS
SETUP
Front Panel LED Status
Indicators During Initial Pow er
Up, Calibration, and
High Speed Data Registration
Step:
Front Panel
Indicator
1
POWER
2
DS
3
US
4
ONLINE
5
LINK
18
Part 1, High Speed Data Registration
1
2
Self
Downstream
Test
Scan
On
On
On
Blinking
On
Off
On
Off
On
Off, On, or
Blinking
On
Off, On, or
Blinking
Off
On or Blinking
Off
On or Blinking
Registration
(continued)
7
Data Network
Registration
Complete
On
On
On
On
On
3
4
Downstream
Ranging
Signal Lock
On
On
On
On
Off
Blinking
Off
Off
Off, On, or
Off, On, or
Blinking
Blinking
On or Blinking
On or
Blinking
On or Blinking
On or
Blinking
On or Blinking
On or
Blinking
5
6
Requesting IP
Request High Speed
Address
Data Provisioning
File
On
On
On
On
On
On
Off
Blinking
Off, On, or
Off, On, or Blinking
Blinking
On or Blinking
On or Blinking
On or Blinking
On or Blinking
On or Blinking
On or Blinking
OL-29159-01