8-6 Troubleshooting
Slowly blinking amber
Indicates that the hard disk drive is being rebuilt (this status is not a failure). If the defected hard disk drive is
replaced with a new one in the disk array configuration, the data is automatically rebuilt (auto rebuild
function).
The lamp goes on green when the rebuild is terminated normally. The lamp goes on amber if the rebuild fails.
IMPORTANT:
hot-swap the failed hard disk drive, and restart rebuilding. Observe the following notes to
use the auto-rebuild feature.
Do not power off the server. (If the server is powered off before rebuilding hard disk
drives, the auto-rebuild feature will not start.)
When you removed a hard disk drive, wait at least 90 seconds before installing the hard
disk drive back again.
Do not replace another hard disk drive while rebuilding is in progress.
To abort rebuilding, power off the server. In such a case, restart the server,