DISASSEMBLY
2-1. FLOW CHART
The following flow chart shows the disassembly procedure.
5
4
3
1 Lock ace x3
2 Cabi (upper)
3 Grip belt
4 Lock ace x3
5 Cabi (L)
1 Lift up the EVF.
2 Tapping P2 x4
3 Down the EVF.
4 EVF block
1 Tapping P2 x4
2 Claw x2
3 P Cabi (C)
SECTION 2
1
2
1
6
7
9
8
4
6
6 Lock ace x3
7 Claw
8 Front panel
Note: Flexible board is connected.
9 FP-795: CN755, CN009
4
5
1
3
7
8
6
2
2
5 EVF Cabi (upper)
6 EVF Cabi (lower)
7 FP-797: LCD902
8 EVF lens
2
3
1
2-1
Note: When you remove Cabinet (R) Block,
or when you assembly, please slide
NS knob to the position of "ON".
3
2
1
6
1
5
4
1 Lock ace x6
2 NS knob to the position of "ON".
3 Cabi (R)
4 VC-341: CN005
5 VC-341: CN002
6 VC-341: CN008
8
4
5
1
6
2
3
1 VC-341: CN004
5 VC-341: CN006
2 VC-341: CN053
6 Tapping P2 x1
3 Lock ace x3
7 Lock ace x1
4 EVF/Battely panel block
8 SS-5100
2
3
7
1
8
4
6
5
1 VF blind sheet
5 Claw
2 VC-341: CN402, CN403, CN481
6 Open the VC-341.
3 VC-341: CN401
7 VC-341: CN404
4 Screw (M1.7) x2
8 VC-341
CCD-TRV128/TRV228/TRV228E/TRV328/TRV428/TRV428E
NS knob
2
5
4
3
HELP
1
1 Tripod Screw
2 Tapping P2 x2
3 Tapping P2 x6
4 Claw
5 CF-5100
6 Tapping P2 x4
7 Claw x2
8 P Cabi (C)
4
7
3
1 VC-341: CN151
2 VC-341: CN201
3 Lens sheet
2
1
1 Screw (M1.7) x3
2 CS frame
2-2
HELP
HELP
8
7
9 q;
qd
qf
qa
qs
qg
6
qh
9 Tapping P2 x2
q; Tapping P2 x1
qa P Cabi (M)
qs PD-204: CN6005
qd PD-204: CN6001
qf PD-204, LCD901, ND901
qg Tapping P2 x4
qh Hinge assy
3
6
1
2
5
4 Lock ace x2
5 Boss
6 Lens LSV-820A
1