hit counter script

Installation - Brother T-8420B Instruction Manual

Twin needle lock stitcher, twin needle split needle bar lock stitcher, twin needle lock stitcher with large hook, twin needle split needle bar lock stitcher with large hook
Hide thumbs Also See for T-8420B:
Table of Contents

Advertisement

4. INSTALLATION

Machine installation should only be carried out by a
qualified technician.
Contact your Brother dealer or a qualified electrician
for any electrical work that may need to be done.
The sewing machine weighs approximately 43 kg.
The installation should be carried out by two or more
people.
Do not connect the power cord until installation is
complete. The machine may operate if the treadle is
depressed by mistake, which could result in injury.
Carrying the machine
The machine should be carried by the arm by two people as
shown in the illustration.
* Make sure that the machine pulley does not turn.
Tilting back the machine head
Hold section (B) with your foot so that the table does not move,
and then push the arm with both hands to tilt back the machine
head.
Returning the machine head to the upright position
1. Clear away any tools, etc. which may be near the table holes.
2. While holding the face plate with your left hand, gently return the
machine head to the upright position with your right hand.
CAUTION
Use both hands to hold the machine head when
tilting it back or returning it to its original position. If
only one hand is used, the weight of the machine
head may cause your hand to slip, and your hand
may get caught.
Be sure to connect the ground. If the ground
connection is not secure, you run a high risk of
receiving a serious electric shock, and problems with
correct operation may also occur.
T-8420B, 8450B, 8720B, 8750B
4. INSTALLATION
2959M
2871M
2872M
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-8450bT-8720bT-8750b

Table of Contents