hit counter script

Brother BAS-342G PS Instruction Manual page 22

Direct drive programmable electronic pattern sewer, "perfect stitch"
Hide thumbs Also See for BAS-342G PS:
Table of Contents

Advertisement

4. INSTALLATION
<Power supply motor P.C. board>
<PMD P.C. board>
2568B
13
Connector
Machine head memory 7-pin
Upper shaft motor 3-pin
Synchronizer 14-pin
Connector
Work clamp pulse motor 4-pin black
Thread trimmer solenoid 6-pin
Tension release solenoid 4-pin
Y pulse motor 4-pin blue
X pulse motor 4-pin white
NOTE:
* Be sure to make the ground connection.
Connection location on
power supply motor P.C.
P3 (HEAD-M)
P4 (UVW)
P5 (SYNC)
Connection location on
PMD P.C. board
P3 (PPM)
P6 (SOL1)
P7 (SOL2)
P8 (YPM)
P10 (XPM)
BAS-342G PS
<Removing>
<Securing>
Route the X, Y and work clamp pulse motor
harnesses so that they do not touch the
PMD P.C.
(Refer to "4-14. Connecting the ground
wire".)
Cord clamp/cable tie
board
Press
the tab.
(4)
(5)
(5), (6)
Cable tie
(5), (6)
(5), (6)
(5), (6)
(5), (6)
(5), (6)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents