hit counter script

Installing The Solenoid Valve Assembly; Connecting The Air Tubes [4]; Installing The Air Hose [5] - Brother BAS-342G PS Instruction Manual

Direct drive programmable electronic pattern sewer, "perfect stitch"
Hide thumbs Also See for BAS-342G PS:
Table of Contents

Advertisement

4-8. Installing the solenoid valve assembly

4-9. Connecting the air tubes [4]

Plugs 4

4-10. Installing the air hose [5]

Connect as shown in
the illustration while
checking the marks.
Branch unions Y
Close
Open
2747B
BAS-342G PS
Install underneath the work table.
to "3. Table processing diagram" for the
installation positions.)
(1) Solenoid valve assembly
(2) Washers [2 pcs.]
(3) Wood screws [2 pcs.]
NOTE:
Make sure that the solenoid valve
assembly does not touch the control
box or the leg of the table.
2745B
1.
Close the cock (1).
2. Turn the nut (3) at the end of the air hose (2) and connect it
to the valve (4).
3. Open the cock at the compressor.
* Check that no air is leaking from the connection of the
valve (4) and air hose (2).
4. Open the cock (1).
(The meter pointer will turn clockwise.)
NOTE:
Turn the cock (1) gently to open it.
5. Adjust the air pressure. (Refer to the next page.)
4. INSTALLATION
(
Refer
2746B
10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents