Page 1
IBM Storwize V5100 Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-U5B...
Page 2
• The information in the “Safety and environmental notices” on page xiii • The information in the IBM Environmental Notices and User Guide (provided on a DVD) This edition applies to version 8, release 3, modification 1, and to all subsequent modifications until otherwise indicated in new editions.
Contents Figures........................v Tables........................ix Compliance standards..................xi Safety and environmental notices............... xiii Safety notices and labels.......................... xiii Caution notices for the system......................xiv Danger notices for the system ......................xvii Special caution and safety notices......................xviii General safety............................ xviii Handling static-sensitive devices......................xix Environmental notices..........................xix About this guide....................xxi Who should use this guide........................
Page 4
Powering on the 5U expansion enclosure................... 46 Powering off the 5U expansion enclosure................... 48 5U expansion enclosure LEDs and indicators..................49 Replaceable units: 5U expansion enclosure ..................53 Connecting the components ........................55 Connecting Ethernet cables to the node canisters................55 Connecting Fibre Channel cables to the control enclosure..............
2. Orientation of ports on node canister 1 (top) ....................4 3. Orientation of ports on node canister 2 (bottom)..................5 4. Rear of the Storwize V5100 enclosure......................6 5. Control enclosure support rails........................12 6. Hole locations in the front of the rack......................12 7.
Page 6
24. Removing the 5U expansion enclosure cover..................31 25. Support rails.............................. 32 26. Detaching the inner rail section........................ 32 27. Screw locations to attach the inner rail to the enclosure................ 32 28. Attaching the inner rail section to the enclosure..................33 29.
Page 7
49. Comparing the location of the components of the CMA assemblies............42 50. Correct orientation for SAS cable connectors..................43 51. Example of SAS cables routed through the cable management arms............ 43 52. SAS cable correctly inserted into the SAS port ..................44 53.
Page 8
74. Expansion enclosure support rails......................64 75. Installing the rail spring..........................65 76. Hole locations in the front of the rack...................... 65 77. Opening the hinge brackets........................66 78. Closing the hinge brackets........................67 79. Removing enclosure end caps........................68 80. Inserting the enclosure..........................68 81.
Page 9
18. Other expansion enclosure parts......................54 19. Selecting bracket pins for your rack......................66 20. Power specifications per power supply....................86 21. Temperature requirements........................87 22. Physical characteristics of the enclosures....................87 23. Rack space requirements for the Storwize V5100 2077-424 or 2078-U5B control enclosure.... 88...
Page 10
24. Clearances..............................88 25. Drive specifications........................... 88 26. Shock testing results..........................89 27. Vibration testing results..........................89 28. Power specifications per power supply....................91 29. Power consumption examples per enclosure..................91 30. Temperature requirements........................92 31. Physical characteristics of the expansion enclosures................93 32. Rack space requirements for the 5U expansion enclosures..............94 33.
Note: You can find and download the current IBM System Safety Notices by searching for Publication number G229-9054 in the IBM Publications Center. The following notices and statements are used in IBM documents. They are listed in order of decreasing severity of potential hazards.
(C011) CAUTION: To avoid personal injury, before lifting this unit, remove all appropriate subassemblies per instructions to reduce the system weight. (C012) xiv Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 15
CAUTION: CAUTION regarding IBM provided VENDOR LIFT TOOL: • Operation of LIFT TOOL by authorized personnel only • LIFT TOOL intended for use to assist, lift, install, remove units (load) up into rack elevations. It is not to be used loaded transporting over major ramps nor as a replacement for such designated tools like pallet jacks, walkies, fork trucks and such related relocation practices.
Page 16
• Do not use a ramp inclined at more than 10 degrees. • When the rack cabinet is in the new location, complete the following steps: xvi Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: • If IBM supplied a power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
• Do not wear loose clothing that can be trapped in the moving parts of a device. Ensure that your sleeves are fastened or rolled up above your elbows. If your hair is long, fasten it. xviii Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
• Take additional care when you handle devices during cold weather. Indoor humidity tends to decrease in cold weather, causing an increase in static electricity. Environmental notices This information contains all the required environmental notices for IBM Systems products in English and other languages. The IBM Systems Environmental Notices information includes statements on limitations, product information, product recycling and disposal, battery information, flat panel display, refrigeration and water-cooling systems, external power supplies, and safety data sheets.
Page 20
Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
IBM to assist you. Information IBM maintains pages on the web where you can get information about IBM products and fee services, product implementation and usage assistance, break and fix service support, and the latest technical information.
Page 23
Using the documentation Sign up for the Support Line Offering If you have questions about how to use and configure the machine, sign up for the IBM Support Line offering to get a professional answer. The maintenance that is supplied with the system provides support when there is a problem with a hardware component or a fault in the system machine code.
Page 24
Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: – If IBM supplied a power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
2078-12F 3 years IBM Storwize V5100 12-slot Expansion Enclosure for 3.5-inch drives 2077-24F 1 year IBM Storwize V5100 24-slot Expansion Enclosure for 2.5-inch drives 2 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 27
__ • SAS cables __ • Drive options for the 24 available drive bays: – Self-compressing, self-encrypting 2.5-inch NVMe-attached IBM FlashCore Modules with the following storage capacities: 4.8 TB, 9.6 TB, and 19.2 TB. – Industry-standard 2.5-inch NVMe-attached SSD drive options with the following storage capacities: 1.92 TB, 3.84 TB, 7.68 TB, and 15.36 TB.
Figure 3 on page 5 shows the bottom node canister. This node canister has the same type and number of adapters installed. However, on the bottom canister, the numbering of the PCI slots and the ports goes from left to right. 4 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
The differences help distinguish the types of node canisters. The main difference is that Storwize V5100 node canisters are not side by side in the control enclosure, but each is the full width (minus the width of both power supplies) and half the height of the control enclosure, sitting one above the other in an inverted orientation.
See the configuring topics in IBM Knowledge Center that contain information about zoning rules and zoning details. To verify that your environment can support Storwize V5100 2077-424 , see Appendix C, “Control enclosure requirements,” on page 85.
Page 31
• Position the enclosure in the rack so that you can easily view it and access it for servicing. • Locate the enclosure low enough for the rack to remain stable. A fully assembled enclosure, containing drives, node canisters, power supplies units, and all possible features weighs approximately 45 kg (99 lb), requiring three people to lift.
Page 32
8 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
When you complete the setup wizard, the setup wizard creates storage arrays and assigns the MDisks to the storage pools. After the installation and initial configuration of the hardware is complete, IBM strongly recommends that you check to see whether a later level of firmware and software is available and update to that level.
Unpacking the control enclosure Before you unpack the Storwize V5100 control enclosure, ensure that you review and follow all related instructions. Before you begin Before you start the installation process, complete the information that is requested in the "Planning worksheets" in IBM Knowledge Center and ensure the following items are available.
7. Carefully cut the raised section of the foam packing away from the rear of the enclosure. 8. Carefully cut open the bag that covers the rear of the enclosure. 9. Remove the left and right PSU, as described in "Removing and replacing a power supply unit" in IBM Knowledge Center.
Large pins are provided separately. Use the pins that are appropriate for the mounting holes in your rack, as described in Table 6 on page 13. 12 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Table 6. Selecting bracket pins for your rack Mounting holes Bracket pins Round, unthreaded Use the preinstalled medium pins. Square Unscrew the medium pins and replace with the large pins that are supplied with the rails. 4. At each end of the rail, grasp the tab and pull firmly to open the hinge bracket.
Note: The rails are not designed to hold an enclosure that is partially inserted. The enclosure must always be in a fully inserted position. Control enclosures must be installed only on the supplied control enclosure rails. 14 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 10. Inserting the enclosure 4. Secure the enclosure with screws in the rack mounting screw holes on each side of the enclosure. See Figure 11 on page 15. Figure 11. Securing the front of the enclosure 5. Reinstall the left and right end caps. The left end cap has indicator windows that align with the status LEDs (light-emitting diodes) on the edge of the enclosure.
3. Cut the corners of the shipping box and fold them down to uncover the sides and faces of the expansion enclosure, as shown in Figure 13 on page 17. 16 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 13. Packaging materials Enclosure Top of shipping box, folded back Foam protectors 4. With four or more persons, push the expansion enclosure sideways onto an adjacent flat bed lift. Keep the remaining foam block protectors attached to the enclosure. 5.
DANGER: Hazardous energy present. Voltages with hazardous energy might cause heating when shorted with metal, which might result in splattered metal, burns, or both. (L005) 18 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 43
DANGER: Observe the following precautions when working on or around your IT rack system: • Heavy equipment–personal injury or equipment damage might result if mishandled. • Always lower the leveling pads on the rack cabinet. • Always install stabilizer brackets on the rack cabinet. •...
Page 44
The weight of this part or unit is more than 55 kg (121.2 lb). It takes specially trained persons, a lifting device, or both to safely lift this part or unit. (C011) 20 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 45
CAUTION: To avoid personal injury, before lifting this unit, remove all appropriate subassemblies per instructions to reduce the system weight. (C012) CAUTION: CAUTION regarding IBM provided VENDOR LIFT TOOL: • Operation of LIFT TOOL by authorized personnel only • LIFT TOOL intended for use to assist, lift, install, remove units (load) up into rack elevations. It is not to be used loaded transporting over major ramps nor as a replacement for such designated tools like pallet jacks, walkies, fork trucks and such related relocation practices.
– Lifting and installing the expansion enclosure in the rack for the first time – Reinstalling the expansion enclosure after you complete a service task (for example, replacing the enclosure FRU). 22 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
• At least three persons are required to move the enclosure while it is in the rack (if you are moving the enclosure off the rails). Even after the drives, power supply units, secondary expander modules, canisters, fans, and top cover are removed, the enclosure weighs approximately 43 kg (95 lbs). •...
Page 48
• Fascia (1U and 4U) • Secondary expansion modules • PSUs • Expansion canisters • Fan modules • Fan interface board • Display assembly • Drives • Cover 24 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 49
Table 10. Enclosure weight as FRUs are installed (continued) Enclosure assembly Approximate weight FRUs installed FRUs not installed 127.9 • Enclosure • Drives • Secondary expansion modules • Cover • Fascia (1U and 4U) • PSUs • Expansion canisters • Fan modules •...
However, as Figure 16 on page 27 shows, the 4U and 1U fascias are packaged separately. You must attach them to the front of the 5U expansion enclosure as part of the initial installation process. 26 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 16. Front fascia of the 5U expansion enclosure Components on the rear of the enclosure Figure 17 on page 27 shows the components on the rear of the 5U expansion enclosure. Four fan modules and two expansion enclosures are accessible from the back of the enclosure. Figure 17.
• Read and follow the safety notices and instructions, as described in “Safety notices and considerations” on page 18. • Read and follow the guidelines that are described in “Weight considerations: 5U expansion enclosure” on page 22. 28 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
• Ensure that a suitably rated mechanical lift is available to support the weight of the expansion enclosure as it inserted into the rack for installation. About this task The 5U expansion enclosure and most parts are shipped together in one large box. A tray on the top of the enclosure contains the front fascia (1U and 4U pieces), the cable management arm (CMA), and the slide rail kit;...
40. 19. Connect the SAS cables, as described in “Removing and installing a SAS cable” on page 42. 20. Connect the power cables. 30 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Removing the top cover To complete some service tasks, you might need to remove the top cover from a 5U expansion enclosure. Before you begin Important: You can remove the cover without powering off the expansion enclosure. However, to maintain operating temperature, replace the cover within 15 minutes of its removal. When the cover is removed, the reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating.
Figure 27. Screw locations to attach the inner rail to the enclosure 5. Install the inner section of the rail onto each side of the expansion enclosure, as shown in Figure 28 on page 33. 32 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 28. Attaching the inner rail section to the enclosure 6. Use the M5 screws to install the outer rail member and bracket assembly to the rack, as shown in Figure 29 on page 33. Figure 29. Installing the rail assembly to the rack frame For example, Figure 30 on page 33 shows the front of the rail that is attached to the frame.
Align the tab on each side of the 1U fascia with the corresponding slots on the enclosure flange. Pins on each flange must also align with a hole in each side of the 1U fascia. 34 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 32. Replace fascia components on the expansion enclosure Installing or replacing a drive Use the following procedure to install a drive for the first time or to replace a faulty drive in a 5U expansion enclosure with a new one received from FRU stock. Before you begin Important: •...
Page 60
4. Touch the static-protective package that contains the drive to any unpainted metal surface on the enclosure. Wear an anti-static wrist strap to remove the drive from the package. 36 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
5. Ensure that the drive handle ( in Figure 37 on page 37) of the drive assembly is in the open (unlocked) position. 6. Align the drive carrier into the appropriate drive slot. Figure 37. Replace the drive 7. Gently push the drive down until it stops and the bottom of the latch is aligned with the top of the partition.
Important: The 5U expansion enclosure is heavy. Before you install the expansion enclosure in the rack for the first time or replace it in the rack to complete a service task, review and implement the following tasks: 38 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 63
• Always use a suitably rated mechanical lift or four persons to raise the enclosure to install it in the rack. Even after the drives, power supply units, secondary expander modules, canisters, fans, and top cover are removed, the enclosure weighs 43 kg (95 lbs). •...
1. Remove the loop straps from the upper and lower CMA assemblies. The straps are used only for shipping. Installing the upper CMA assembly Figure 45 on page 41 shows the connectors on the upper CMA assembly. 40 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 45. Connectors for the cable management arm Inner connector on upper CMA Connector base on inner rail member Outer connector on upper CMA Connector base on outer rail member Support rail connector on upper CMA Connector base on outer rail member 2.
(port 1) on the expansion canister. The output cable connects to the left port (port 2) on the canister. 42 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 67
Procedure Removing a SAS cable 1. Locate the connector at the end of the SAS cable that is to be removed from the expansion enclosure. 2. Grasp the connector by its blue tag. Pull the tag. 3. Release the connector and slide it out of the SAS port. 4.
Note: When you insert SAS cables, ensure that the connector is oriented correctly to the control enclosure and expansion enclosure. • For systems, Storwize V5100 control enclosures, and 2077-24F 2U expansion enclosures, the blue pull tab must be below the cable ( in Figure 53 on page 44).
– Ethernet ports, including the technician port. The technician port is used for initial setup of the system by directly attaching to a personal computer. It can also be used to complete service actions for the system. – USB ports. –...
Figure 56 on page 46). As the figure also shows, the PSUs are covered by the 1U fascia Figure 56. Features on the front of the 5U expansion enclosure Display panel LEDs 46 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Rack retention thumb screws Power supply unit LEDs Power supply units (PSUs) PSU fascia (1U) Front fascia (4U) Each PSU has a power supply connector and power cable, which are accessible from the back of the enclosure. Power is provided by plugging a C19-C20 power cable into each power supply unit and, if necessary, turning on the power source.
In the system view, select the expansion enclosure to be powered off. Then, select Dependent Volumes. If no configuration changes are made, other volumes remain available to the system. 48 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Procedure 1. Stop all I/O to the system from hosts that access the expansion enclosure. 2. Unmount any associated file systems. 3. Wait 5 minutes for all write data to be flushed to the drives. 4. Unplug both of the power cords from the rear of the expansion enclosure to remove all power from the enclosure.
( Figure 62. LEDs on a drive assembly Table 14 on page 51 describes the meaning of the LEDs on each drive. 50 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Table 14. LED indicators on drives Function Color Status Description Activity Green The drive is ready to be used. Flashing The drive is operating and I/O is occurring. The drive is not installed or an installed drive is not ready to be used. Fault Amber A fault occurred on the drive.
Green Canister is off. status Normal operation. Flashing A vital product data (VPD) error occurred. Canister Green Canister is off. power Canister is receiving power. 52 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
On 5U expansion enclosures, all replaceable parts are customer-replaceable units (CRUs). Expansion enclosure drives Table 17 on page 53 summarizes the part numbers and feature codes for the 2077-92F, 2077-A9F expansion enclosure, which is supported by Storwize V5100 systems. Table 17. Supported expansion enclosure SAS drives FRU Part Number...
FRU part number 01LJ112. Avoid contact with the connectors on the main board. 54 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
16A power cord C19/C20 2 m Connecting the components After installing the rails and enclosures in the rack, the Storwize V5100 control enclosures are connected to power, the network, and any optional expansion enclosures. After all cabling connections are completed, the system components are powered on.
Connect SAS port 1 of the lower node canister in the control enclosure to SAS port 1 of the right expansion canister in the first expansion enclosure. 56 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 67. Connecting the SAS cables 2. To add a second expansion enclosure chain to the control enclosure, use the supplied SAS cables to connect the control enclosure to the expansion enclosure at rack position 2. Refer to Figure 67 on page 57 for an example.
Note: On Storwize V5100 control enclosures, node canister 1 is inverted from node canister 2. Because the orientations of the ports differ, you must ensure that the orientation of the SAS cables is also correct for each canister.
• Ensure that cables are installed in an orderly way to reduce the risk of cable damage when replaceable units are removed or inserted. Figure 69. Connecting the SAS cables Powering on the 5U expansion enclosure Use the following procedure to provide power to the 5U expansion enclosure as part of the initial installation process or after a service procedure.
When secured, the power and SAS cables stay connected when you slide the expansion enclosure out of the rack to perform service tasks. 60 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 72. Power and SAS cable connections on the back of the enclosure 3. Verify that the expansion enclosure and its components are operating as expected. On the back of the expansion enclosure, all four fans and the expansion canister indicators ( in Figure 73 on page 61) become active when the power is connected.
Page 86
• Ensure that each power cable is secured to each PSU on the back of the enclosure. What to do next Next, you will connect an Ethernet cable to the technician port on the control enclosure, and initialize the system. 62 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
65.) c) Stretch the spring slightly and push the other looped end of the spring onto the other stud on the inside of the rail. 64 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 75. Installing the rail spring 4. Working at the front of the rack cabinet, identify the two standard rack units (2U) of space in the rack into which you want to install the support rails. Figure 76 on page 65 shows two rack units with the front mounting holes identified. Figure 76.
8. On the rear of the rail, press the two bracket pins into the holes in the rack flanges. 9. Close the rear hinge bracket to secure the rail to the rack cabinet flange. (See Figure 78 on page 67.) 66 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 78. Closing the hinge brackets 10. On the front of the rail, press the two bracket pins into the holes in the rack flanges. 11. Close the front hinge bracket to secure the rail to the rack cabinet flange. See Figure 78 on page 67.
Rotate the end cap down until it snaps into place. d) Ensure that the inside surface of the end cap is flush with the chassis. 68 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 81. Reinstalling enclosure end caps 6. If you are installing additional 2U SAS expansion enclosures, repeat the previous steps to complete the installation. Powering on the optional 2U SAS expansion enclosures After you install all the hardware components, power on the optional 2U SAS expansion enclosures and check their status.
Page 94
The canister is ready with no critical errors when Power is illuminated, Status is on, and Fault is off. 3. Wait for all expansion canisters to finish powering on before you proceed with the system installation process. 70 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
GUI pages. IBM supports higher versions of the browsers if the vendors do not remove or disable function that the product relies upon. For browser levels higher than the versions that are certified with the product, customer support accepts usage-related and defect-related service requests.
Page 96
In the Privacy section, click Content settings. d. In the Cookies section, select Allow local data to be set. e. Click OK. f. Refresh your browser. 72 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
3. Enable file download on IE 11 running on Windows 2012. a. In Internet Explorer, click Tools > Internet Options. b. On the Internet Options window, select the Security tab. c. On the Security tab, click the Internet zone. d. Click Custom level to customize the security level for this zone. e.
Have the following information on hand: • The management IP address of the system • Licensed key information • The worksheets that were completed during the system planning process 74 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Page 99
, Global Mirroring, and Metro Mirroring. (Real-Time Compression is not supported.) You need an External Virtualization license for storage that is not Storwize V5100 . This license is based on a per capacity unit of metric. Because subcapacity licensing applies, the amount of storage FlashCopy or Remote Mirror licenses does not always match the quantity of externally virtualized storage licenses.
Verify and update the system firmware and software (customer task) After the installation and initial configuration of the hardware is complete, IBM strongly suggests that the customer checks to see whether a later level of firmware and software is available, and update to that level.
GUI” on page 71). Note: For more information about installing the support rails and other hardware for 2U and 5U expansion enclosures, see IBM Knowledge Center. Procedure To add an expansion enclosure to your system, complete the following steps.
Page 102
78 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
The management GUI requires a supported web browser. (See “Checking your web browser settings for the management GUI” on page 71.) Note: You cannot add a second control enclosure to another Storwize V5100 system. Procedure To add a control enclosure to an existing system, complete the following steps.
Page 104
80 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
5U expansion enclosures. Each Storwize V5100 enclosure contains two PSUs for redundancy. The total power consumption values represent the total power that is drawn by both PSUs. 86 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Enclosure Height Width Depth Maximum weight Drive ready Fully (without configured drive) (with drives) Storwize V5100 2077-424 87 mm (3.46 483 mm 850 mm (33.5 44.85 kg 49.65 kg and 2078-U5B Control in.) (19.0 in.) in.) (98.87 lb) (109.46 lb)
The noise emission level that is stated is the declared (upper limit) sound power level, in decibels, for a random sample of machines. All measurements are made in accordance with ISO 7779 and reported in conformance with ISO 9296. 88 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Figure 85 on page 89 indicates the declared noise emissions values in accordance with ISO 9296. Figure 85. Acoustical Declaration with Noise Hazard Notice Shock and vibration specifications for Storwize V5100 enclosures Table 26 on page 89 and Table 27 on page 89 provide the shock and vibration testing results for your Storwize V5100 system.
Page 114
90 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Ensure that space is available in a standard 19" rack that can support the enclosure. The rack rail kits support racks with either threaded round or square rail mounting holes. The following table lists the dimensions and weights of the expansion enclosures. 92 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Table 31. Physical characteristics of the expansion enclosures Enclosure Height Width Depth Maximum weight Drive ready Fully (without configured drives) (with drives) 2077/2078-12F, 87 mm (3.46 483 mm 556 mm (21.9 16.7 kg (36.8 25.0 kg (55.1 2077/2078-24F, or in.) (19.0 in.) in.) 2077/2078-AFF...
The noise emission level that is stated is the declared (upper limit) sound power level, in decibels, for a random sample of machines. All measurements are made in accordance with ISO 7779 and reported in conformance with ISO 9296. 94 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
IBM recommends that you consult with qualified experts in this field to determine whether you are in compliance with the applicable regulations.
Page 120
<=5 g Rotational vibration Normal operation performance Throughput loss for all drives of the same measurements in enclosure with no type within performance profile. external vibration. 96 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...
Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the web at Copyright and trademark information at www.ibm.com/legal/copytrade.shtml.
Contact an IBM representative or reseller for any questions. Electromagnetic compatibility notices The following Class A statements apply to IBM products and their features unless designated as electromagnetic compatibility (EMC) Class B in the feature information. When attaching a monitor to the equipment, you must use the designated monitor cable and any interference suppression devices that are supplied with the monitor.
Tel: 914-499-1900 Der verantwortliche Ansprechpartner des Herstellers in der EU ist: IBM Deutschland GmbH Technical Relations Europe, Abteilung M456 IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 800 225 5426 e-mail: Halloibm@de.ibm.com Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55032 Klasse A.
Japan Voluntary Control Council for Interference (VCCI) Notice Korea Notice People's Republic of China Notice Russia Notice Taiwan Notice Notices 101...
Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors, or by unauthorized changes or modifications to this equipment.
Index air flow 61 power cords 62, 69 powering on the system 61 browsers, See web browsers rails control enclosure 11 expansion enclosure 63 reader feedback xxii comments xxii configuration web browsers settings 71 control enclosure SAS cables 44 location guidelines 7 SAS expansion enclosure power cords 62 installing 67...
Page 128
104 Storwize V5100 : Quick Installation Guide for MTM 2078-424, 2078-12F, 2078-24F, 2078-92F, and 2078-...