hit counter script

Advertisement

Quick Links

20/04/2021
INSTALLATION MANUAL
Residential
Battery unit
LG Electronics strongly advises users to exercise due care in following LGE's
product installation manual. A warranty claims are invalid if damage is
caused by human error, inconsistent with the installation manual.
MODEL
LG HBP 16H
(BLGRESU16HP)

Advertisement

Table of Contents
loading

Summary of Contents for LG HBP 16H

  • Page 1 20/04/2021 INSTALLATION MANUAL Residential Battery unit LG Electronics strongly advises users to exercise due care in following LGE’s product installation manual. A warranty claims are invalid if damage is caused by human error, inconsistent with the installation manual. MODEL LG HBP 16H...
  • Page 2: Table Of Contents

    The information included in this manual is accurate at the time of publication. However, this manual is subject to change without prior notice. In addition, the illustrations instructions. Please note the images shown are for illustration purposes only. Contents 1 Safety 3.2 Installation process for Remote Monitoring Device (RMD) 3.2.1 Prepare for installation using RMD 1.1 Symbols...
  • Page 3: Safety

    Do not dispose of the product with household waste The Product includes internal fault mechanisms designed to prevent failures and subsequent risk hazards. However, LG Electronics cannot guarantee safety performance of the Product is ever exposed to abuse, damage or negligence.
  • Page 4: Warning Label

    : Electrical license for battery installation required by the country or state Battery CE / RCM / IEC 62619 / UL1973 / Pack IEC62477-1 Repair the battery by disassembly is possible only at the LG Service Center or by Emissions Class 9 Transportation UN38.3...
  • Page 5: Features

    2.3 Maintenance 1. Short Circuit Current/Duration Short Circuit Current 1.616 kA BLG RESU16HP does not require maintenance during normal operation if properly installed Duration 0.44 ms per the installation manual. In the event of fault, contact the regional service center. 2.
  • Page 6: Basic Lifting Guide

    3.1.2 Basic lifting guide 4. Pull out the bundled items, including Refer to below guide for lifting and carrying the Battery Control Unit and Battery Modules the Module Connecting Plate. during installation. Handling position Installer A 5. Pull out Battery Module B. Installer B 6.
  • Page 7: Clearance

    3.1.5 Clearance 3.1.8 System Clearance Recommended clearances for the left, Ceiling right and top of the product are shown in pack and inverter should be in accordance with the installation guide manual of the inverter. 500 mm installer convenience. (20") NOTE An external DC isolator may be installed within the clearance zone.
  • Page 8 3. Remove the Drill template. Then pre- 7. Remove bubble wrap from Battery Control Unit tighten the fasteners on the Standing connectors of Battery Control Unit Bracket 1. and the warning label of Battery Modules. * The fasteners will be fully tightened Standing bracket 1 in a later step.
  • Page 9 11. Check the operation of the battery 15. Loosen 4 bolts and remove the Top pack by following the steps below. Cover. 1) Hold and turn the handle M5xL65 Flange Bolt counterclockwise. 2) Open the front cover and turn on the circuit breaker switch.
  • Page 10 20. Open the front cover. 24. Connect the cables according to their application. * Hold the handle and turn it counterclockwise. * Refer to Section 3.3 Cable Connections. Handle Front Cover 25. Arrange the power cables and communication cables separately using cable ties.
  • Page 11 3.2.1.3 User Registration (RMD) 3.2.1.3.1 Visit https://resumonitor.lgensol.com Remote monitoring device (RMD) is a remote device that can install and monitor a battery pack through App. and web. 3.2.1 Prepare for installation using RMD 3.2.1.1 Installer Sign In 3.2.1.1.1 Visit https://resumonitor.lgensol.com 1.
  • Page 12 3.2.2.3 User Agreement 9. Select the “Owner” option. 10. Enter your ID and Password. 1. Search the product which you will install. 11. Click the “Sign In” button. 2. Get the agreement of privacy policy for the customer. 3. If the customer agrees the privacy policy, have customer’s personal information. App.
  • Page 13 3.2.2.5 QR Code Scan 3.2.2.6.2 Wi-Fi Connection The QR code scanning method is as follows. If you are using an ethernet connection and do not wish to use Wi-Fi, simply click the “Next” button. Select Prime: Fixed at 2 FLEX: Select from 2 to 4 S/N of consecutive QR codes are automatically displayed(Maximun 5)
  • Page 14 3.3 Cable Connections IoT Hub Connection String: Enter the unique string provided to you in order to access the Azure IoT Hub (cloud server). The string format is as follows: HostName=emashub.azure-devices.net;DeviceId=XXXX;SharedAccessKey=OOOO= Section C * For more information on how to obtain strings, refer to Section 3.2.1.2 Obtaining IoT Hub Section A Section B Section D...
  • Page 15 4 Commissioning 4. Section E: Battery power port a) Connect the ground wire to Terminal 2. 4.1 LED Indicators b) Connect the negative line of the power cable to Terminal 3. The LED indicators on the front of the battery pack show its operational state as follows: c) Connect the positive line of the power cable to Terminal 1.
  • Page 16 6. Contact LG Electronics regional service contact point. CAUTION LED Status Action If the battery pack or the inverter indicates FAULT or fails to operate, contact LG Electronics regional contact point or your distributor immediately. Power on Charging Visually check if the wiring matches the installation manual. (Section Discharging 3.3 Cable Connections.)
  • Page 17 6 Uninstallation & Return 7. Loosen six (6) M6 bolts and disassemble Standing Bracket #2 6.1 Return/Replacement Instructions Bracket #1 from the wall. 6.1.1 Uninstallation Uninstall the battery pack in the following order: 1. Switch the inverter OFF before beginning uninstallation of the battery 8.
  • Page 18 If the battery pack seems to be damaged, contact LG Electronics regional contact point or your distributor. Use the contacts below for technical assistance. These phone numbers are available only during business hours on weekdays.
  • Page 19 7.2 RMD Applications Fault Name error code Support action required Return the battery to LG Over Voltage Fault2 DiagResultFault2 0x0001 Electronics. Under Voltage Fault2 DiagResultFault2 0x0002 Battery pack On and check How to check the battery status is as follows.
  • Page 20 3) BMS, DC/DC and RMD Update Can upgrade F/W. Upgrade is performed on the following three targets. - RMD - BMS - DC/DC First, proceed with RMD Wi-Fi direct connection as shown below. 3. According to the target you want to update, click the 'Choose File' button.
  • Page 21 7.2.3.2 Battery Installation (RMD Setup) 7.2.3.1 User Agreement Visit https://resumonitor.lgensol.com and Sign in. Search and access the SSID of the RMD AP from a device (hereinafter referred to as a device) supporting WLAN Station functions such as a smartphone. RMD SSID has a structure of “RESU_(or RMD) + RMD WLAN STM MAC ADDRESS”. Select your region (Non EU/EU).
  • Page 22 1. Click the Scan AP button on the top right of the Web UI. 123456 and can be changed in the Web UI. 2. The number of APs available is displayed in a pop-up window. 3. Select the AP to access from the SSID combo box, enter the password and click the Connect button(Manual input is possible).

This manual is also suitable for:

Blgresu16hp

Table of Contents