DSA E-Series (E2800 60-bay) Table of contents | en Table of contents Safety Safety message explanation Safety precautions Important safety instructions Warning notices Caution notices Notices Introduction Hardware registration Additional equipment Additional documentation System overview Device views LED description 3.2.1 LEDs on the operator display panel 3.2.2...
Page 4
| Table of contents DSA E-Series (E2800 60-bay) 8.2.3 Installing a power canister 8.2.4 After replacing a power canister Replacing a fan canister 8.3.1 Preparing to remove a fan canister 8.3.2 Removing and replacing a fan canister 8.3.3 After replacing a fan canister Seven-segment display codes 8.4.1...
DSA E-Series (E2800 60-bay) Safety | en Safety Safety message explanation Notice! Indicates a situation which, if not avoided, could result in damage to the equipment or environment, or data loss. Caution! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
Page 6
SELV circuits. – If safe operation of the unit cannot be ensured, remove it from service and secure it to prevent unauthorized operation. In such cases, have the unit checked by Bosch Security Systems. –...
Do not remove more than one canister from the enclosure while power to the enclosure is turned on. – Bosch products may contain Class 1 laser devices, Class 1M laser devices, or both. – Keep away from moving fan blades.
| Safety DSA E-Series (E2800 60-bay) Warning! To prevent electrical shock hazard, disconnect all power cables from the electrical outlet before relocating the system. Warning! Risk of bodily injury, A lead-acid battery can weigh up to 10.9kg (24.1lb). When you remove this type of battery, be prepared to support its weight.
Page 9
Safety | en Notice! Video loss is inherent to digital video recording; therefore, Bosch Security Systems cannot be held liable for any damage that results from missing video information. To minimize the risk of losing information, we recommend multiple, redundant recording systems, and a procedure to back up all analog and digital information.
Bosch Product Registration page. Registering your device using an existing NetApp NOW account Sign in to your NetApp NOW account and register your device here. Creating a new account using the Bosch Product Registration page Please register your product: https://www.boschsecurity.com/product-registration/...
DSA E-Series (E2800 60-bay) System overview | en System overview Device views 60-bay dual controller unit or expansion unit - front view Status displays Drive drawer 1 - 5 (drive drawer 1 is at the top and drive drawer 5 is at the bottom) 60-bay dual controller unit - rear view Controller A...
| System overview DSA E-Series (E2800 60-bay) Management port 1 (left) / Serial port (RJ45) Management port 2 (right) - Dual 1 Gigabit Ethernet Note: Use only Port 1 per controller (default). Serial port (micro USB) USB port (only for factory use) Dual 12 Gb SAS drive expansion ports Status display Channel 5 (left) / Channel 6 (right) -...
DSA E-Series (E2800 60-bay) System overview | en 7-segment display Power LED Attention LED Locate LED Drive canister The following table describes the LEDs and their operational states: Status indicator Description Power Green One or more power supplies are supplying power to the unit.
Page 14
| System overview DSA E-Series (E2800 60-bay) Channel 3 - host port link status LED Channel 3 - host port attention LED Channel 4 - host port link status LED Channel 4 - host port attention LED Management port 1 - Ethernet status Management port 1 - Ethernet activity Management port 2 - Ethernet status...
DSA E-Series (E2800 60-bay) System overview | en Status indicator Description There is no link between the controller and the connected Ethernet port. Blinking green There is Ethernet activity. Ethernet link state (left) Green Link is established. No link is established.
| System overview DSA E-Series (E2800 60-bay) IOM attention LED IOM locate LED The following table describes the LEDs and their operational states: Status indicator Description Attention Amber The IOM is not functioning correctly. The IOM is functioning correctly.
DSA E-Series (E2800 60-bay) System overview | en 3.2.5 LEDs on the drive drawer Each of the 5 drive drawers in the 60-bay controller unit and the 60-bay expansion unit includes a single Attention/Locate LED for the unit and 12 Activity LEDs for the drives.
| System overview DSA E-Series (E2800 60-bay) Attention/Locate drive LED 0 Attention/Locate drive LED 1 Attention/Locate drive LED 2 Attention/Locate drive LED 3 Attention/Locate drive LED 4 Attention/Locate drive LED 5 Attention/Locate drive LED 6 Attention/Locate drive LED 7 Attention/Locate drive LED 8 Attention/Locate drive LED 9 Attention/Locate drive LED 10 Attention/Locate drive LED 11...
Page 19
DSA E-Series (E2800 60-bay) System overview | en Attention LED Solid amber: The fan is faulty. Bosch Security Systems B.V. 2021.05 | V3 | DOC Installation manual...
You can install the unit in either a square-hole or round-hole rack. – If you are installing the unit in a cabinet not provided by Bosch: – Ensure that the rack is adequate for the weight and size of the unit to be installed.
You can install the unit in either a square-hole or round-hole rack. – If you are installing the unit in a cabinet not provided by Bosch: – Ensure that the rack is adequate for the weight and size of the unit to be installed.
Page 22
| Installation DSA E-Series (E2800 60-bay) – Repeat this step for the right rail. Place the back of the unit (the end with the connectors) on the rails. Caution: An empty unit weighs approximately 60 kg (132 lbs). Four persons are required to safely move an empty unit.
DSA E-Series (E2800 60-bay) Installation | en For both front rail posts: Secure the unit to the front of the rack or system cabinet and rails by inserting the screws through the holes of the unit, the holes on the rack or system cabinet, and the holes on the front of rails.
Page 24
| Installation DSA E-Series (E2800 60-bay) Tighten the round-to-square hole adapter brackets with the screws to the four rack posts. Leave enough room for the hook-piece of the rail between the rail adapters and the rack posts. M4x10 Attach the rails to the rack or system cabinet as follows: –...
Page 25
DSA E-Series (E2800 60-bay) Installation | en Caution: An empty unit weighs approximately 60 kg (132 lbs). Four persons are required to safely move an empty unit. A fully loaded unit weighs approximately 113 kg (250 lbs). A mechanical lift is required to safely move the unit.
| Installation DSA E-Series (E2800 60-bay) Installing the drives Notice! To avoid damaging the hardware, never move a unit if drives are installed. Remove all drives before moving the unit. To install the drives: Put on the ESD wristband to protect the drives from static electricity.
DSA E-Series (E2800 60-bay) Installation | en Setting the unit ID using the ODP button You can set or change the unit ID for a controller unit or a expansion unit by using the operator display panel (ODP) button. Before you begin You might need to remove the front bezel or the end cap to see the ODP button.
Connecting the controller unit to the network In case of a Bosch Video Recording Solution a host is an IP camera. To connect the controller unit to the Ethernet one or two of two available iSCSI host ports must be connected to the Ethernet.
| Connection DSA E-Series (E2800 60-bay) Private network Management station or personal computer Local Area Network (LAN) Switch or hub Dual controller unit Controller A Controller B Management port 1 (Ethernet) Note: Used as default. Management port 2 (Ethernet) Note: Reserved for maintenance operations if the hardware contains a second Ethernet port.
If any of the amber LEDs are on, there might be a problem with a component. Confirm you completed the installation steps correctly. If you are unable to resolve the problem, contact your local Bosch Technical Support team. Supported connections We recommend using the following connection methods: Bosch Security Systems B.V.
Page 32
| Connection DSA E-Series (E2800 60-bay) Default Alternatively LN K LN K P1 LN K LN K P1 Controller A e0c e0d e0c e0d LN K LN K P1 LN K LN K P1 Controller B e0c e0d e0c e0d Management port 1 (Ethernet)
If any of the amber LEDs are on, there might be a problem with a component. Confirm you completed the installation steps correctly. If you are unable to resolve the problem, contact your local Bosch Technical Support team. Connect all cables if required.
| Configuring the storage system DSA E-Series (E2800 60-bay) Configuring the storage system This chapter describes the basic configuration of the storage system using the Configuration Manager program. To get a basic configuration, do the following steps: Start the Configuration Manager program.
Page 35
DSA E-Series (E2800 60-bay) Configuring the storage system | en 10. Drag the Target x folder from the left side (Source) to the right side (VRM System), then click OK. 11. In the device tree, below the storage system, click Target x.
Attention LED is on. You can hot-swap a failed drive while the unit is receiving I/O operations. Before you begin – You have a replacement drive that is supported by Bosch for the controller unit or expansion unit. – You have an ESD wristband, or you have taken other antistatic precautions.
DSA E-Series (E2800 60-bay) Maintenance | en – Always wear an ESD wrist strap grounded to an unpainted surface on your storage enclosure chassis. If a wrist strap is unavailable, touch an unpainted surface on your storage enclosure chassis before handling the drive.
| Maintenance DSA E-Series (E2800 60-bay) an attention icon on the drive handle just behind the LED. 1 = Attention LED on drive drawer – Unlatch the drive drawer by pulling on both levers. – Using the extended levers, carefully pull the drive drawer out until it stops.
DSA E-Series (E2800 60-bay) Maintenance | en Gently pull back the orange release latch that is in front of the drive you want to remove. The cam handle on the drive springs open partially, and the drive is released from the drawer.
| Maintenance DSA E-Series (E2800 60-bay) Align the two raised buttons on each side of the drive carrier with the matching gap in the drive channel on the drive drawer. 1 = Raised button on the right side of the drive carrier Lower the drive straight down, and then rotate the cam handle down until the drive snaps into place under the orange release latch.
When the drive reconstruction completes, the volume group is in an optimal state. As required, reinstall the bezel on the front of the unit. Return the failed part to Bosch, as described in the RMA instructions shipped with the kit.
| Maintenance DSA E-Series (E2800 60-bay) – The OK to remove field in the Details area of the Recovery Guru in SANtricity System Manager displays Yes, indicating that it is safe to remove this component. Notice! If the second power canister in the unit does not have Optimal status or if the Recovery Guru indicates that it is not OK to remove the power canister, contact your technical support..
DSA E-Series (E2800 60-bay) Maintenance | en From the back of the storage array, look at the Attention LEDs to locate the power canister you need to remove. You must replace the power canister that has its Attention LED on.
| Maintenance DSA E-Series (E2800 60-bay) Remove the antistatic protection. Collect support data for your storage system (see Collecting support data for the storage system, page 51 ). Note: Collecting support data before and after replacing a component ensures you can send a full set of logs to technical support in case the replacement does not resolve the problem.
DSA E-Series (E2800 60-bay) Maintenance | en Preparing to remove a fan canister, page 45 Removing and replacing a fan canister, page 46 After replacing a fan canister, page 46 8.3.1 Preparing to remove a fan canister Before removing a fan canister, use SANtricity System Manager to collect support data about your storage system and to locate the failed component.
| Maintenance DSA E-Series (E2800 60-bay) Attention LED Solid amber: The fan is faulty. 8.3.2 Removing and replacing a fan canister When you remove the failed fan canister, you do not have to turn off power to your storage array.
DSA E-Series (E2800 60-bay) Maintenance | en If a failed fan canister is still being reported, repeat the steps in Removing and replacing a fan canister on page 4. If the problem continues to persist, contact technical support. Remove the antistatic protection.
| Maintenance DSA E-Series (E2800 60-bay) Category Category code Detail code – bl: Base controller card Diagnostic failure – Lx: Lock-down codes – See Seven-segment display lock- down codes. Category delimiter Note: The double hyphen (--) is the separator between...
Page 49
DSA E-Series (E2800 60-bay) Maintenance | en Use case Display sequence Controller power-on – Normal power-on controller insertion SE 88 blank – Controller inserted while held in reset Operational states Normal operation xy (static controller tray ID) Start-of-day (SOD) processing...
| Maintenance DSA E-Series (E2800 60-bay) Use case Display sequence The memory size changed with dirty data in OE L2 -- CF dx blank- the flash drives The controller is suspended as a result of diagnostic errors Cache memory diagnostic failure...
DSA E-Series (E2800 60-bay) Maintenance | en Lock-down code Description The controller has locked down in a suspended state with limited SYMbol support. A controller firmware mismatch has been detected. The controller does not have enough memory to support the configuration.
Page 52
| Maintenance DSA E-Series (E2800 60-bay) Select the storage system. Select Tools > Execute Script. Type the following command in the text box. save storageArray supportData file="filename"; In this command, filename is the file path and the file name to which you want to save the support data.
– Repair & Exchange – Product Security Bosch Building Technologies Academy Visit the Bosch Building Technologies Academy website and have access to training courses, video tutorials and documents: www.boschsecurity.com/xc/en/support/training/ Bosch Security Systems B.V. 2021.05 | V3 | DOC Installation manual...
Page 54
| Support services and Bosch Academy DSA E-Series (E2800 60-bay) 2021.05 | V3 | DOC Bosch Security Systems B.V. Installation manual...