hit counter script

Top Cable Management Bracket (A9Xx-Top-Cbl-Mgmt) - Cisco NCS 4206 Installing

Table of Contents

Advertisement

Installing the Cisco NCS 4206

Top Cable Management Bracket (A9XX-TOP-CBL-MGMT)

To install the optional top cable management bracket, perform these steps:
Step 1
Connect the grounding lugs using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug
to the ground wire.
Figure 26: Cable Management Bracket - Rear
Step 2
Connect the other end of the ground wire to a suitable grounding point at your site.
Step 3
Position the cable management brackets against the front of the rack and align the four screw holes, as shown in the figure
below.
Top Cable Management Bracket (A9XX-TOP-CBL-MGMT)
Installing the Cisco NCS 4206
33

Advertisement

Table of Contents
loading

Table of Contents