E.3.3
Placing the load
• Before placing the load, make sure the way is free and that
the floor is flat and can take the load.
• Remove the appliance from the wooden pallet, move it to
one side, then slide it onto the floor.
E.3.4
Placing the load
Before placing the load, make sure the way is free and that the
floor is flat and can take the load.
For more information please refer to the installation chapter.
E.4
Storage
The machine and/or its parts must be stored and protected
from damp, in a non-aggressive place, free of vibrations and
with room temperatures between -10℃ [14℉] and 50℃
[122℉].
The place where the machine is stored must have a flat
support surface to avoid deforming the machine or damage to
the support feet.
CAUTION
Do not make modifications to the parts
supplied with the appliance. Any missing
or faulty parts must be replaced with
original parts.
F
INSTALLATION AND ASSEMBLY
WARNING
Refer to "Safety Information".
F.1
Customer responsibilities
The Customer must provide for the following:
• installation of an adequate electrical power supply ahead of
the appliance, according to the equipment's technical
specifications (D.1 Main technical characteristics and D.2
Characteristics of power supply);
• the equipotential connection
system to the metal structure of the machine by means of a
copper cable of adequate section (see position "EQ" in
Installation diagram);
• adducting for the electrical connection between the work-
place electric panel and the equipment;
• the water supply and drain connections and other con-
nections as indicated in D.1 Main technical characteristics
and in the paragraph F.6 Plumbing connections;
F.2
Machine space limits
• A suitable space must be left around the machine (for
operations, maintenance, for a correct air exchange, etc.).
• This space must be increased in case of use and/or transfer
of other equipment and/or means or if exit routes are
necessary inside the workplace.
CAUTION
Install the machine at a distance of not
less than 200 mm from the wall so as not
to affect correct ventilation of internal
components.
16
of the workplace electrical
E.5
Unpacking
IMPORTANT
Immediately check for any damage caused during
transport.
Inspect the packaging before and after unloading.
1. Remove the packaging.
Take care when unpacking and handling of the appliance
to not cause any shocks on itself.
2. Keep all the documentation contained in the packaging.
Note
• The forwarder is responsible for the goods during transport
and delivery.
• Make a complaint to the forwarder in case of visible or
hidden damage.
• Specify any damage or shortages on the dispatch note.
• The driver must sign the dispatch note: the forwarder can
reject the claim if the dispatch note is not signed (the
forwarder can provide the necessary form).
• For hidden damage or shortages becoming apparent only
after unpacking, request the forwarder for inspection of the
goods within and no later than 15 days after delivery.
F.3
Extraction hood
The extractor hood is installed to remove the steam emitted by
the machine.
• Make sure to position the possible extraction hood at a
distance of not less than 400 mm from the machine so as
not to compromise machine operation.
• The hood air delivery must be calculated taking into account
the machine model, the type of installation and the work
environment where installed.