HULL
HOOD
Deck and hull
1
a
a
BOW
1
Drain plug check
2
1. Check:
Front protector 1 installation
1. Install:
TIP
Apply soapy water to the inner surfaces a of
the grommets before installing the projections
b of the front protectors.
b
Spout installation
1
1. Install:
TIP
Face the mark a toward the bow.
Reboarding step installation (FZS)
1
1. Install:
Installation steps:
1. Fasten the brackets on both sides of the
2. Finger tighten all of the bolts, and then
8-50
• Drain plug 1
• O-ring 2
Cracks/damage → Replace the drain
plug.
• Front protectors
• Spout 1
Spout nut:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
• Reboarding step
reboarding step in the down position with
plastic ties 1 as shown so that they will
not return to the up position.
tighten them to the specified torque.
Reboarding step assembly bolt:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
LOCTITE 271
E
1
2
3
4
5
6
7
8
9