hit counter script

Rack-Mount Placement - Cisco SRW224G4-K9-NA Quick Start Manual

Managed switches
Table of Contents

Advertisement

Some switches have a higher temperature rating. The SG300-
N
OTE
10SFP, SG300-52P and SG300-52MP are rated at 113 degrees
Fahrenheit (45 degrees Centigrade), and the SG300-28MP, and SF300-
24MP are rated at 122 degrees Fahrenheit (50 degrees Centigrade).
Reduced Air Flow—Both side panels must be unobstructed to prevent
overheating.
Mechanical Overloading—The device should be level, stable, and
secure to prevent it from sliding or shifting out of position.
Circuit Overloading—Adding the device to the power outlet must not
overload that circuit.

Rack-Mount Placement

Remove the four screws from each side near the front of the switch.
S
1
TEP
Retain the screws for re-installation. (Do not remove the four screws
from each side near the back of the switch.)
Place one of the supplied spacers on the side of the switch so the
S
2
TEP
four holes of the spacers align to the screw holes. Place a rack
mount bracket next to the spacer and reinstall the four screws
removed in
If your screws are not long enough to reattach the bracket with
N
OTE
the spacer in place, attach the bracket directly to the case without the
spacer.
Repeat
S
3
TEP
After the mounting hardware has been securely attached, the
S
4
TEP
switch is now ready to be installed into a standard 19-inch rack.
300 Series Managed Switches
Step
1.
Step 2
for the other side of the switch.
3

Advertisement

Table of Contents
loading

Table of Contents