OL-30505 -01
3
Chapter 3
Operation of Front Panel
Indicators
Introduction
This section describes the behavior of the front panel indicators when
the residential gateway is first powered up, during normal operations,
and in special conditions.
In This Chapter
Initial Power Up, Calibration, and Registration (AC Power
Applied) ..............................................................................................20
Normal Op erations (AC Power Applied) ........................................22
Special Conditions ..............................................................................24
19