Chapter 3 Setup
1.
Turning on the Server
Pressing the POWER switch at the front of the server turns on the server.
Turn on the server by using the following procedure.
1.
Turn on the peripheral devices that connect to the display monitor and the server.
2.
Press the POWER switch at the front of the server.
The POWER LED is turned on green and after a while, the NEC logo appears on the display.
While the NEC logo is being displayed, the self-diagnostic program (POST) runs and diagnoses the
hardware. For details, refer to Chapter 3 (1.1.1 POST sequence).
158
Do not power on the server before amber POWER LED is unlit.
Tips
Wait for at least 30 seconds before turning on the server after turning off the
server.
Note
If the power cord is connected to power control system such as an Uninterruptible
Power Supply (UPS), make sure that the power control system is turned on.
Important
Do not connect or disconnect USB device while POST is running.