In-room chilled water smart cooling product (32 pages)
Summary of Contents for Huawei NetCol5000-C030
Page 1
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual Issue Date 2021-03-15 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements ● Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations. ●...
10 kW per cabinet. This brings challenges of heat dissipation, energy conservation, and environment protection to the existing cooling system. Huawei's brand-new in-row smart cooling product solves the heat dissipation problem caused by high-density deployment in data centers, reduces the cooling power consumption and power usage effectiveness (PUE) value of data centers, and is compatible with existing standard cabinets.
Page 29
Remote Users can monitor and manage one or more devices using the management remote management function provided by Huawei. Storage ● A large number of fault alarm records can be stored. Alarms can be managed by severity. A maximum of 500 historical alarms can be stored for each severity.
24%; the supply/return water temperatures are 10°C/15°C respectively; and the static pressure outside the smart cooling product is 0 Pa. 2.9 Technical Specifications (NetCol5000-C030/C032) Table 2-6 Technical specifications of NetCol5000-C030/C032 Item NetCol5000-C030 NetCol5000-C032 Power system...
Standard configuration. This Pay attention to the type and material type of materials is provided quantity of materials in the by Huawei, and you can find packing list. them in the fittings delivered with the equipment. Auxiliary Customers can purchase this...
(2) NetCol5000-C065: Seamless steel pipe with inner threads (reserved device port) a G 1–1/2 in. external threaded connector (engineering purchase) NetCol5000-C030/C032: G 1 in. port with inner threads (reserved device port) NetCol5000-C030/C032: Seamless steel pipe with a G 1 in. external threaded connector...
Page 54
3 Installation Step 2 Unfasten the rotating baffle plates, and remove the air filters. Figure 3-16 Removing an air filter (NetCol5000-C065) Figure 3-17 Removing an air filter (NetCol5000-C030/C032) NO TE For single-cabinet packaging and dual-cabinet packaging, the methods for removing air filters are the same.
Page 55
If gas emits, the system is normal. Slowly open the exhaust valve to discharge nitrogen and close the valve when there is no airflow through the valve. ● If no gas emits out of the valve, contact Huawei technical support. Figure 3-19 Checking the nitrogen pressure (NetCol5000-C065) Issue 04 (2021-03-15)
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation Figure 3-20 Checking the nitrogen pressure (NetCol5000-C030/C032) ----End Follow-up Procedure Check that thermal insulation foam is in close contact with the pipes, there is no crack in each cutting position, and the chilled water valve is tightly wrapped by thermal insulation foam.
NO TICE Exercise caution when moving the cabinet to prevent falling down. ----End 3.5.2 Removing the Pallet (NetCol5000-C030/C032) Procedure Step 1 Remove the connecting kit that secures the cabinet to the pallet. ● For single cabinet packaging: Remove the connecting kit that secures the...
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation 3.6.2 Leveling and Combining Cabinets (NetCol5000-C030/ C032) Procedure Step 1 Level the cabinet. Use a socket wrench to adjust the leveling feet at the bottom of the smart cooling product, and use a measuring tape and a level to adjust the horizontal and vertical distances of the smart cooling product.
Smart Cooling Product User Manual 3 Installation Figure 3-31 Securing the device to the base ----End 3.7.2 Securing the Device (NetCol5000-C030/C032) Prerequisites Secure the smart cooling product to the base. If there are no bases onsite, prepare one by referring to Figure B-2.
● When routing pipes from the top, take protective measures to prevent pipe leakage from affecting servers or other devices. ● Wrap the pipes with thermal insulation foam. 3.8.1 Water Pipe Positions Figure 3-33 Water pipe positions (NetCol5000-C030/C032, bottom pipe routing) (1) Water inlet pipe (2) Water outlet pipe Issue 04 (2021-03-15)
Page 66
Smart Cooling Product User Manual 3 Installation (3) Automatic drainpipe (4) Humidifier water inlet pipe Figure 3-34 Water pipe positions (NetCol5000-C030, top and bottom pipe routing) (1) Water inlet pipe (2) Water outlet pipe (3) Forcible drainpipe (4) Humidifier water inlet pipe...
● To replace the entire device, it is recommended that an active connector of the pipe is reserved for connection. ● NetCol5000-C030/C032 need to make the holes for the chilled water inlet and outlet pipes using a knife. Step 3 Clean the pipe and remove the thermal insulation foam from the pipe plug.
● In connecting the pipes, avoid violent shake. ● NetCol5000-C030/C032 need to make the holes for the chilled water inlet and outlet pipes using a knife. Step 3 Clean the pipe and remove the thermal insulation foam from the pipe plug.
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation Figure 3-44 Nitrogen injection and pressure preservation (NetCol5000-C030/ C032) (1) Needle valve NO TE Top and bottom pipe routing is not supported by the NetCol5000-C032. Step 3 After 24 hours, if the pressure drop is less than 0.01 MPa, the pipes do not leak.
Connect the PE cable to the marked position in the upper part of the cabinet, and connect the cable to the external ground system. Figure 3-47 Connecting an equipotential PE cable (NetCol5000-C065) Figure 3-48 Connecting an equipotential PE cable (NetCol5000-C030/C032) 3.12.3 Connecting Power Cables Issue 04 (2021-03-15)
Page 77
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation Figure 3-50 Removing the cover of the electric control box (NetCol5000-C030) Figure 3-51 Removing the cover of the electric control box (NetCol5000-C032) (1) Positioning pins (2) Positioning pin holes Step 3 Connect power cables.
Page 78
Connect the cables with crimped terminals to the L, N, and PE. NO TE NetCol5000-C065 uses a common screwdriver to secure the cables, NetCol5000-C030/ C032 uses a 100-120 mm screwdriver to secure the cables. Place the connected power cables vertically, use the clip to secure them in a proper position, and use screws to secure the clip.
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation Figure 3-58 Connecting the FE teamwork network cable (NetCol5000-C030/C032) Figure 3-59 Connecting FE teamwork network cables (multiple units) ----End 3.12.4.3.2 Connecting the CAN Teamwork Cable Context In CAN networking, one teamwork network supports a maximum of 32 smart cooling products.
Page 87
Smart Cooling Product User Manual 3 Installation Figure 3-69 Cables routed outside the cabinet (NetCol5000-C030/C032) NO TE ● The T/H sensors should be 1.5 m above the ground (33 U). ● Each smart cooling product supports a maximum of ten T/H sensors.
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 3 Installation Figure 3-71 Securing a differential pressure sensor (NetCol5000-C030/C032) Step 2 Connect the pressure inlet tube. ● Cold aisle containment: Connect a pressure inlet tube to the + mark and route it to the aisle through the hole on the top of the cabinet.
Page 92
Confirm with Huawei technical support before modifying parameters which cannot be modified by user operator. Otherwise, Huawei will not be liable for any consequences of the modification performed by the user. ● Only certified professionals are allowed to modify the advanced parameters.
Offline Boot or Online Boot can be selected for the first startup. NO TICE ● Download the Service Expert app from HUAWEI AppGallery. The app can only run on Android currently. You must apply for the permission to use the app after downloading it.
● If a floor water overflow alarm is generated, the default action is Shutdown. If there is no need to shut down the unit, contact Huawei technical support. Evaluate the risk, choose Settings > System Settings > System Control, and set Water overflow alarm action to Inactivity, Only indoor fan running, or Humidifier stopped.
Page 122
NO TICE The Service Expert app can be downloaded from Huawei app store and runs on Android. User interfaces are for reference only. ● Offline boot: Enter the barcode and verification code on the mobile phone app to generate a startup password, and start the smart cooling product on the controller screen.
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 4 Power-On Commissioning Figure 4-35 Drainage needle valves of the heat exchanger (NetCol5000-C030/ C032) (1) Drainage needle valves 1 (2) Drainage needle valves 2 Step 2 Connect a nitrogen cylinder to the drainage needle valve 1 of the heat exchanger, set the intake pressure to 0.5 MPa, and blow nitrogen into the valve for 10...
Pay attention to the safety symbols on the equipment and all safety instructions in this document. The safety precautions given in this document do not cover all safety precautions. Huawei will not be liable for any consequence caused by violation of the safety operation regulations and design, production, and usage standards.
Smart Cooling Product User Manual 6 System Operation and Maintenance Figure 6-4 Removing a fan (NetCol5000-C030/C032) Step 3 Install the new fan in a reverse order of the removal. Step 4 Connect cables to the new fan and close the front door.
Page 167
Figure 6-6 Replacing a wet film humidifier (NetCol5000-C030/C032) NO TE For the NetCol5000-C030/C032, remove the butterfly nut and sheet metal fastener. Step 4 Remove the hose clamp and remove the water inlet pipe. Step 5 Draw out the old wet film humidifier.
Page 169
6 System Operation and Maintenance Figure 6-7 Removing a differential pressure switch (NetCol5000-C065) Figure 6-8 Removing a differential pressure switch (NetCol5000-C030/C032) Step 5 Set the value to 300 Pa for the new differential pressure switch. Install it in the reverse order of...
NetCol5000-C(030, 032, 065) In-row Chilled Water Smart Cooling Product User Manual 6 System Operation and Maintenance Figure 6-10 Removing a T/H sensor (NetCol5000-C030/C032) Step 5 Install the new T/H sensor at the original position, and connect the cable terminals to the T/H sensor. NO TE Before installing the new T/H sensor, ensure that its DIP switch setting is consistent with that on the original T/H sensor.
Page 172
Figure 6-11 Position of the supply air temperature sensor (NetCol5000-C065) Figure 6-12 Position of the supply air temperature sensor (NetCol5000-C030/ C032) Step 4 Remove the waterproof connector from the temperature sensor cable and remove the supply air temperature sensor probe.
Page 175
Step 4 Take out the handle and pull out the rectifier from the subrack. Figure 6-15 Replacing a rectifier (NetCol5000-C065) Figure 6-16 Replacing a rectifier (NetCol5000-C030/C032) Step 5 Remove the old rectifier, insert the new rectifier to the corresponding slot, and flip down the clip to lock the rectifier.
User Manual 6 System Operation and Maintenance Figure 6-18 Replacing the main control board (NetCol5000-C030/C032) Step 5 Install a new main control board and secure it using the removed screws. Step 6 Reinstall the cover of the electric control box.
Page 181
6 mm. Figure 6-21 Replacing a display module (NetCol5000-C065) Figure 6-22 Replacing a display module (NetCol5000-C030/C032) Install the new display module in the original position on the front door by performing the preceding steps in reverse order.