hit counter script

Front End Controller Board (Fec)(Rft) - GE Vivid 3N Pro Series Service Manual

Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
FK091075, R
IRECTION
5-4-8

Front End Controller Board (FEC)(RFT)

The Front End Controller (FEC) Board controls other boards in the Front End Crate. The control is done
through a synchronous and bidirectional Bus called the Front End Bus. The following tasks are
performed by the FEC Board:
System master clock generation (including clock to IP).
Transmitter control.
ATCG control.
Receive focusing control.
Analog test signal control.
Probe sensing.
Transmit voltage control.
Control of Front Board switching.
Temperature sensing for the TEE probes.
Memory refresh control for the BF Board.
Provide 40 MHz clock to IP.
FB, TX, RFT Trig Ps-A25
FB, ATGC P2-B37+
FB, Probe CTRL P3
All Boards P3-D25
5-22
04
EVISION
FE Bus P2
Front End Bus
Generator
Test Signal
Generator
P2-D37-
FB P-B35
XDCCTRL
Revision Detect
P3-D26
Figure 5-1: Front End Controller Block Diagram
Section 5-4 - Front End
Interface
AGTC
Interface
EI Probe
ID/Select
V
3N P
/E
IVID
RO
XPERT
System Clock
Generator
VME Bus
VMA Bus
Interface
P IP
CPU
Memory
P3 FB
HV Control
P3 FB
HV Readback
S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents