hit counter script

Cisco 7513 Hardware Installation And Maintenance Manual page 210

Hide thumbs Also See for 7513:
Table of Contents

Advertisement

and
Configuring
Installing
Replacing
There
FSIP
the
FSIP
Caution
cooling
inside
handle
Step
Step
Step
Step
Step
Step
Step
Step
Step
This completes
instructions
7513
Hardware
5-48
Cisco
Processor Modules
FSIP
Chassis
the
the
in
now
be
should
four
or eight port adapters
until
install
all
you
port adapters
slot
Do
FSIP
the
not
reinstall
air to
freely through
escape
and
the chassis
allow
components
by
the handles
interface
processors
FSIP
Grasp
the
handle
with
FSIP and
the
guide
into
it
back
FSIP
Place
the
of the
the
the slot
in
See
groove
While
FSIP
the
keeping
the
carrier
into
slot
until
5-2
Figure
thumb
and
the
forefinger of each
Using
shown
bottom
the
lever
as
up
connector
Use
number
Phillips
on
screws
the top
installation
Reconnect
network
the
interface
ports
When
new
the
insert
you
OIR
information
about
the
up and
the configuration
to
that
verify
command
Use
the configure
do
have
do
You
not
this
to
them and
configure
bring
the interfaces
After
configure
you
command
the
to
display
the port adapter
replacement
the related
software
refer
to
and
Maintenance
Installation
the
installed
on
or
install
until
you
unless
are installed
port adapters
all
the cutouts
the faceplate
in
on
other boards
overheat
to
and
carrier
only
edges
and
one hand
your other
place
Avoid
5-3
See
the slot
Figure
align the notch
and
the
in
slot
5-2
Figure
orientation
at
to
90-degree
FSIP
makes
the
contact
faceplate
hand
simultaneously
in
5-2
to fully
Figure
screwdriver
flat-blade
or
3/16-inch
and bottom
FSIP
of the
or other connection
cables
the console
terminal
FSIP
the interfaces
reinitializes
as
it
of the interfaces
matches
that
command
or the setup
facility
but the interfaces
immediately
them
up
show
use the
controller
of the
new
interfaces
status
procedure For
complete
documentation
FSIP
not do
there are
not
If
blank
interface
filler
processor
The
will
empty
port
which
could
misdirect
the airflow
ESD
To
damage
prevent
hand under
the
carrier
to
board
the
touching
bottom
the
of the
on
carrier
the
backplane
carefully
slide
the ejector levers
with
down
the top lever
push
FSIP
the
in the backplane
seat
the captive
to
tighten
FSIP
the
to
equipment
several
of
will
lines
display
the
of the interfaces
state
Change
you
replaced
new
the
interfaces
to
configure
be
available
until
will not
show
serial or the
interfaces
command
descriptions
install
in the
allow
support
with
the
See
and
interface
status
you
and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents