hit counter script

Huawei E9000 User Manual page 89

Hide thumbs Also See for E9000:
Table of Contents

Advertisement

E9000 Server
User Guide
4.
5.
6.
Step 3 Install power cables.
1.
Issue 25 (2019-11-30)
Figure 3-46 Laying out and binding the PGND cable
Remove the cut-off ends of the cable ties from the cabinet.
Use a Phillips screwdriver to remove the M6 screw on the earthing strip of the cabinet.
Use a Phillips screwdriver to fasten the other end of the PGND cable to the ground
terminal on the earthing strip.
Figure 3-47 Fastening the PGND cable
Check the power supply type.
– If the AC power supply is used, go to
– If the DC power supply is used, go to
Copyright © Huawei Technologies Co., Ltd.
Step
3.2.
Step
3.3.
3 Installing the E9000
79

Advertisement

Table of Contents
loading

Table of Contents

Save PDF