Step 2
Slide the open end of your 2-hole ground lug over the exposed area of the ground wire.
Step 3
Using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug to the ground wire as shown
in the figure below.
Figure 7: Crimping a Ground Lug onto the Ground Wire
Step 4
Use a Phillips head screwdriver to attach the 2-hole ground lug and wire assembly to the router with the 2 pan-head Phillips
head screws. For a 19-inch EIA rack, attach the 2-hole ground lug to the rear of the router.
Step 5
Connect the other end of the ground wire to a suitable grounding point at your site.
Installing the Fan Tray
The fan tray is a modular unit that provides cooling to the Cisco ASR 903 Router. Follow these steps to install the fan tray in the
chassis:
11