Wall installed units (US version)
1. Remove the connection box cover.
2. Remove the front cover by releasing the retaining clip with a screw driver and
lifting the cover from the bottom outwards.
2
1
3. Remove the gland plate by undoing the fastening screws.
4. Make the cable entry holes in the gland plate by breaking off the suitable knock-
out plates with a screw driver.
5. Fasten the cable glands to the opened holes of the gland plate.
6. Lead the cables through the glands.
7. Fasten the gland plate (3).
8. Connect the grounding conductors of the input and motor cables to the
grounding clamps.
9. Remove the clear plastic shroud as shown in section
procedure
10. Connect the phase conductors of the input cable to the U1, V1 and W1 terminals
and the phase conductors of the motor cable to the U2, V2 and W2 terminals.
See
lug installation, use UL listed cable lugs and tools given below or corresponding
to meet UL requirements.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
on page 62.
Wall installed units (European version)
8
3
4
Power cable installation
for cabling figures. In case of a cable
65
8
3
4
Electrical installation