9. Additional refrigerant charge

At the time of shipping, the outdoor unit is charged with the refrigerant. As this
charge does not include the amount needed for extended piping, additional charg-
ing for each refrigerant line will be required on site. In order that future servicing
may be properly provided, always keep a record of the size and length of each
refrigerant line and the amount of additional charge by writing it in the space pro-
vided on the outdoor unit.
9.1. Calculation of additional refrigerant
charge
Calculate the amount of additional charge based on the length of the piping
extension and the size of the refrigerant line.
Use the table to the below as a guide to calculating the amount of additional
charging and charge the system accordingly.
If the calculation results in a fraction of less than 0.1 kg, round up to the next
0.1 kg. For example, if the result of the calculation was 10.62 kg, round the
result up to 10.7 kg.
<Additional Charge>
Additional
High pressure
High pressure
refrigerant
pipe size
pipe size
=
+
charge
Total length of
Total length of
ø28.58 × 0.39
ø22.2 × 0.23
(m) × 0.39 (kg/m)
(m) × 0.23 (kg/m)
(kg)
High pressure
High pressure
pipe size
pipe size
+
+
Total length of
Total length of
ø12.7 × 0.12
ø9.52 × 0.06
(m) × 0.12 (kg/m)
(m) × 0.06 (kg/m)
<Example 1>
Indoor No. 1: 40
A: ø19.05
40 m
No. 2: 200
B: ø9.52
10 m
No. 3: 40
No. 4: 32
No. 5: 63
The total length of each liquid line is as follows:
ø19.05: A = 40 m
ø9.52: B + b + e = 10 + 5 + 10 = 25 m
ø6.35: a + c + d = 10 + 10 + 10 = 30 m
Therefore,
<Calculation example>
Additional refrigerant charge
= 40 × 0.16 + 25 × 0.06 + 30 × 0.024 + 2 = 10.7 kg
<Example 2>
Indoor No. 1: 40
A: ø22.2
40 m
No. 2: 100
B: ø9.52
10 m
No. 3: 40
C: ø12.7
10 m
No. 4: 32
D: ø12.7
10 m
No. 5: 63
No. 6: 200
No. 7: 32
No. 8: 32
The total length of each liquid line is as follows:
ø22.2: A = 40 m
ø12.7: C + D = 10 + 10 = 20 m
ø9.52: B + b + e + f = 10 + 5 + 10 + 10 = 35 m
ø6.35: a + c + d + g + h = 10 + 10 + 10 + 5 + 5 = 40 m
Therefore,
<Calculation example>
Additional refrigerant charge
= 40 × 0.23 + 20 × 0.12 + 35 × 0.06 + 40 × 0.024 + 3.0 + 2.0 = 19.7 kg
Value of α1
Total capacity of connecting indoor units
to Model 80
Models 81 to 160
Models 161 to 330
Models 331 to 480
Models 481 to 630
Models 631 to 710
Models 711 to 890
Models 891 to 1070
Value of α2
BC controller (standard,master only)
BC controller (slave) connected (one)
BC controller (slave) connected (two)
10
High pressure
High pressure
pipe size
pipe size
+
+
Total length of
Total length of
× 0.16
× 0.11
ø19.05
ø15.88
(m) × 0.16 (kg/m)
(m) × 0.11 (kg/m)
High pressure
pipe size
+ α1 + α2
+
Total length of
× 0.024
ø6.35
(m) × 0.024 (kg/m)
a: ø6.35
10 m
At the
b: ø9.52
5 m
conditions
c: ø6.35
10 m
below:
d: ø6.35
10 m
e: ø9.52
10 m
a: ø6.35
10 m
b: ø9.52
5 m
c: ø6.35
10 m
At the
d: ø6.35
10 m
conditions
e: ø9.52
10 m
below:
f: ø9.52
10 m
g: ø6.35
5 m
h: ø6.35
5 m
α 1
1.0 kg
1.5 kg
2.0 kg
2.5 kg
3.0 kg
4.0 kg
5.0 kg
6.0 kg
α 2
0 kg
1.0 kg
2.0 kg
9.2. Precautions concerning piping connec-
tion and valve operation
Conduct piping connection and valve operation accurately.
Flange type side connecting pipe is assembled in factory before shipment.
1 For brazing to the connecting pipe with flange, remove the connecting pipe
with flange from the ball valve, and braze it outside of the unit.
2 During the time when removing the connecting pipe with flange, remove
the seal attached on the rear side of this sheet and paste it onto the flange
surface of the ball valve to prevent the entry of dust into the valve.
3 The refrigerant circuit is closed with a round, close-packed packing upon
shipment to prevent gas leak between flanges. As no operation can be
done under this state, be sure to replace the packing with the hollow pack-
ing attached at the piping connection.
4 At the mounting of the hollow packing, wipe off dust attached on the flange
sheet surface and the packing. Coat refrigerating machine oil (Ester oil,
ether oil or alkylbenzene [small amount]) onto both surfaces of the pack-
ing.
[Fig. 9.2.1] (P.3)
A Close-packed packing
B Hollow packing
After evacuation and refrigerant charge, ensure that the handle is fully open. If
operating with the valve closed, abnormal pressure will be imparted to the
high- or low-pressure side of the refrigerant circuit, giving damage to the com-
pressor, four-way valve, etc.
Determine the amount of additional refrigerant charge by using the formula,
and charge refrigerant additionally through the service port after completing
piping connection work.
After completing work, tighten the service port and cap securely not to gener-
ate gas leak.
Flare machining dimension for systems using R410A is larger than that for
systems using other types of refrigerant in order to increase the air tightness.
Refer to the table on the below for flare machining dimensions, and follow the
regulations set forth by the local authorities. Seal off the opening of the pipe
with a closure material (not supplied) to keep small animals from entering the
pipe if that is a concern.
flare machining dimension (mm)
outer diameter
ø6.35
ø9.52
ø12.70
ø15.88
ø19.05
flare nut size (mm)
outer diameter
ø6.35
ø9.52
ø12.70
B
ø15.88
ø19.05
[Fig. 9.2.2] (P.3)
<A> [Ball valve (Low press. side/flanged type)]
<B> [Ball valve (High press. side/flared type)]
<C> [Ball valve (High press. side/flanged type)]
<D> This figure shows the valve in the fully open state.
A Valve stem
[Fully closed at the factory, when connecting the piping, when evacuating, and
when charging additional refrigerant. Open fully after the operations above are
completed.]
B Stopper pin [Prevents the valve stem from turning 90° or more.]
C Packing (Accessory)
[Manufacturer: Nichiasu corporation]
[Type: T/#1991-NF]
D Connecting pipe (Accessory)
[Use packing and securely install this pipe to the valve flange so that gas leakage
will not occur. (Tightening torque:40 N·m) Coat both surfaces of the packing with
refrigerating machine oil. (Ester oil, ether oil or alkylbenzene [small amount])]
E Open (Operate slowly)
F Cap, copper packing
[Remove the cap and operate the valve stem. Always reinstall the cap after op-
eration is completed. (Valve stem cap tightening torque: 23 ~ 27 N·m)]
dimension A
size in inches
R410A
1/4"
9.1
3/8"
13.2
1/2"
16.6
5/8"
19.7
3/4"
24.0
dimension B
size in inches
R410A
1/4"
17.0
3/8"
22.0
1/2"
26.0
5/8"
29.0
3/4"
36.0