Operator Display Panel II (ODP II)

Product Description

These instructions explain how to field install or
replace the BACnet Fume Hood Controller FHC.
The Fume Hood Controller Operator Display Panel
(ODP) is the interface between the fume hood
operator and the controller system. The mounting
plate is designed for the fume hoods with or without
existing cutouts.
Designed for wall-mounting (A). A conduit box
is optional.
Base plate (B) has screw holes for all
commercially available conduit boxes. The
height of the screw heads must not exceed 3
mm.
Device (C) incorporates a plug, an LCD panel,
emergency purge and horn silence buttons.
Item No. 570-111. Rev. AA
Installation Instructions
Product Number
575-820A
Required Tools
For fume hood with an existing cutout, you need:
Medium Phillips-head screwdriver
For fume hood without a cutout, you need:
Medium duty electric drill
1-1/2 inch (38 mm) hole saw bit
Prerequisites
Cable from controller to ODP is in place.
Cable from controller to ODP is less then 50 feet
(15 m) in length.
Document No. 570-111
February 18, 2013
Page 1 of 4

Advertisement

loading

Summary of Contents for Siemens Operator Display Panel II

  • Page 1: Product Description

    Installation Instructions Document No. 570-111 February 18, 2013 Operator Display Panel II (ODP II) Product Description These instructions explain how to field install or replace the BACnet Fume Hood Controller FHC. The Fume Hood Controller Operator Display Panel (ODP) is the interface between the fume hood operator and the controller system.
  • Page 2 5. Push until locking tab clicks in place. ODP. 2. Attach the mounting plate to the mounting surface using the screws provided. NOTE: The height of the screw heads must not exceed 3 mm. Page 2 of 4 Siemens Industry, Inc.
  • Page 3 6. Connect the power module to the ODP and Fume Hood Controller. The installation is complete. Dismounting the ODP 1. Push the locking tab with a screwdriver until it releases. Mounting plate dimensions. 2. Remove the display fro the mounting plate. Siemens Industry, Inc. Page 3 of 4...
  • Page 4 Information in this document is based on specifications believed correct at the time of publication. The right is reserved to make changes as design improvements are introduced. Product or company names mentioned herein may be the trademarks of their respective owners. © 2013 Siemens Industry, Inc. Siemens Industry, Inc.