Page 3
GENERAL PRECAUTIONS REGARDING THE INSTALLA- TION, SERVICE AND MAINTENANCE FOR e-BRIDGE ID GATE (KP-2004) The maintenance should be done by a qualified service technician. 1) When installing the e-BRIDGE ID Gate, follow the procedure described in the co-packed Unpacking Instructions.
00: No authentication using a noncontact IC card 02: Authentication using a noncontact IC card (KP-2003) 03: Authentication using a noncontact IC card (KP-2005) 04: Authentication using a noncontact IC card (KP-2004) • ZZZZ: Sub-code 0000: No authentication using a noncontact IC card...